KAFD

MIXED-USE

KAFD – PARKING & COMMERCIAL DEVELOPMENT

Riyadh, Saudi Arabia

A large-scale development comprising five underground parking levels, extensive landscaped areas, and eight diverse commercial buildings. Our team delivered the full BIM scope from LOD 300 model development through LOD 500 handover, covering multidisciplinary coordination, clash detection, shop drawings, quantity takeoff, design issue resolution, COBie, and as-built deliverables.

Client

Consultant

Main Contractor

Project Type

Project Role

BIM Scope

BIM Development

Project Duration

KAFD – King Abdullah Financial District

Saudi Consult

TAJ Dhabi

Parking & Commercial Development

Technical Office · BIM Delivery & Engineering Support

Full BIM Delivery · Coordination · Shop Drawings · Quantity Takeoff

LOD 300 → LOD 500

2024 – 2025

Client

Multiple International Clients

Project Type

Data Center Design

Services​

Revit Modeling · Coordination · Documentation

Software​

Revit · Navisworks · AutoCAD · ACC

Year​

2024 – 2026

PROJECT HIGHLIGHTS

LOD 300 → LOD 500

Developed and progressed the project BIM models from LOD 300 design information to LOD 500 handover-level information.

FULL BIM DELIVERY

Complete BIM scope covering modeling, coordination, clash detection, shop drawings, quantity takeoff, QA/QC, COBie, and as-built deliverables.

MULTI-DISCIPLINARY SYSTEMS

Detailed BIM development across HVAC, Plumbing, Fire Fighting, Power, Wet Utilities, Low Current, and specialist building services.

CONTINUOUS COORDINATION

Weekly coordination and model quality review meetings with the main contractor’s BIM team, supported by ACC-based issue management and review.

PROJECT OVERVIEW

KAFD was a large-scale and highly complex development in Riyadh, consisting of five underground parking levels, extensive landscaped areas, and eight diverse commercial buildings. The project included a wide range of building services and technically demanding areas requiring intensive BIM coordination and model development.

Project Type

Parking & Commercial Development

Project Coverage

KAFD · Riyadh, Saudi Arabia

Development

5 Underground Parking Levels

Buildings

8 Commercial Buildings

BIM Development

LOD 300 → LOD 500

BIM Scope

Full BIM Delivery

Technical Role

Technical Office · BIM Support

Key Deliverables

Shop Drawings · COBie · As-Built

BIM SCOPE

Our team was responsible for the complete BIM scope, taking the project models from LOD 300 through progressive development to LOD 500 deliverables. Our work included multidisciplinary BIM modeling, coordination, clash detection, shop drawings, quantity takeoff, design issue resolution, QA/QC, COBie, and   as-built information.

01

MODEL DEVELOPMENT

Development of detailed multidisciplinary BIM models from LOD 300 design information toward LOD 500 handover requirements.

02

BIM COORDINATION

Continuous coordination of MEP and building services across parking levels, commercial buildings, landscaped areas, and specialist technical spaces.

03

CLASH DETECTION

Identification, review, and resolution of hard clashes, spatial conflicts, and system interface issues.

04

SHOP DRAWINGS

Production of coordinated shop drawings and technical documentation derived from the developed BIM models.

05

QUANTITY TAKEOFF

Model-based quantity extraction to support project planning, procurement, and commercial requirements.

06

QA/QC

Regular model review and quality verification to maintain BIM standards, model integrity, and deliverable accuracy.

07

COBie & DATA

Development and management of structured BIM information for asset data and information handover.

08

AS-BUILT BIM

Progressive development and documentation of as-built information toward final LOD 500 deliverables.

LOD DEVELOPMENT

FROM DESIGN TO HANDOVER

Developing the received design information into structured BIM models and coordinated building services.

01

LOD 300

Design Information

Developing system interfaces, resolving spatial conflicts, and coordinating multidisciplinary services.

02

LOD 350

Coordination & Interfaces

Detailed model development and production of coordinated shop drawings and technical deliverables.

03

LOD 400

Construction Information

Final model development incorporating as-built information, asset data, COBie, and handover requirements.

04

LOD 500

Handover & As-Built

BIM COORDINATION & QA/QC

Weekly coordination meetings were held with the main contractor’s BIM team to review model issues, coordination challenges, outstanding actions, and overall model quality.

01

WEEKLY BIM REVIEWS

Regular coordination meetings with the contractor’s BIM team.

02

ISSUE MANAGEMENT

Tracking and reviewing coordination issues through Autodesk Construction Cloud.

03

MODEL QA/QC

Continuous review of model quality, consistency, and coordination status.

04

ISSUE RESOLUTION

Technical issues were reviewed, coordinated, and resolved before progressing to the next delivery stage.

SYSTEMS WE MODELED

HVAC

Detailed HVAC systems and associated services.

PLUMBING

Domestic water, drainage, and plumbing systems.

FIRE FIGHTING

Fire protection systems and associated networks.

POWER

Electrical power distribution and related systems.

WET UTILITIES

Building and site wet utility networks.

LOW CURRENT

Low current and specialist building systems.

SPECIALIST SERVICES

Additional technical and building service systems across the development.

SPECIALIST TECHNICAL AREAS

High-density technical areas required detailed BIM coordination to integrate multiple systems within constrained spaces.

PUMP ROOMS

Pumps, piping, equipment and associated services.

ELECTRICAL ROOMS

Electrical equipment and power distribution systems.

ICT ROOMS

ICT infrastructure and associated services.

SERVER ROOMS

Specialist systems and service coordination.

MEP SERVICE ROOMS

Integrated coordination of multiple building services.

DESIGN PROBLEM SOLVING

Throughout the project, BIM coordination was used not only to identify clashes, but also to uncover design inconsistencies, spatial constraints, and constructability issues. Our team worked through these challenges to develop coordinated solutions and improve the overall project outcome.

01

DESIGN ISSUE IDENTIFICATION

Identifying inconsistencies and technical issues during model development.

02

SPATIAL OPTIMIZATION

Resolving congested and constrained service areas.

03

COORDINATED SOLUTIONS

Developing practical solutions across multiple disciplines.

04

REWORK REDUCTION

Resolving issues early helped reduce downstream rework and unnecessary project costs.

PROJECT VISUALS

Explore selected BIM models, design views, and technical deliverables developed across our data center projects.

LOD 500 HANDOVER

Progressive model development from LOD 300 to final LOD 500 deliverables.

COORDINATED DESIGN

Improved integration of multiple building services across complex project areas.

REDUCED REWORK

Early identification and resolution of design and coordination issues.

INFORMATION-RICH DELIVERY

Structured BIM information supported by COBie and as-built deliverables.

PROJECT OUTCOMES

Supporting better design decisions through BIM-driven collaboration.

HAVE A PROJECT IN MIND?

Let’s Build It With Precision.

Tell us about your MEP BIM requirements and let’s discuss how Gridline can support your project.