P134

RESIDENTIAL

P134 – RESIDENTIAL TOWER

Riyadh · Saudi Arabia

A high-rise residential development comprising 23 floors above four basement levels dedicated to parking. The project represents a typical modern Gulf residential building, where efficient BIM coordination is essential to integrate dense MEP systems within a vertically structured environment. Our team is supporting the project through comprehensive BIM development, coordination, clash detection, shop drawings, and technical documentation.

Client

Consultant

Main Contractor

Project Type

Project Role

BIM Scope

BIM Development

Project Duration

OSUS

Rafik El-Koury & Partners

TDCO

High-Rise Residential

Technical Office · BIM Delivery & Engineering Support

Full BIM Delivery · Coordination · Shop Drawings · Quantity Takeoff

LOD 300 → LOD 500

2025- 2026

Client

Multiple International Clients

Project Type

Data Center Design

Services​

Revit Modeling · Coordination · Documentation

Software​

Revit · Navisworks · AutoCAD · ACC

Year​

2024 – 2026

PROJECT HIGHLIGHTS

HIGH-RISE RESIDENTIAL

A 23-storey residential tower developed within a vertically intensive building environment.

FOUR-LEVEL BASEMENT

Four underground parking levels requiring detailed coordination of building services and infrastructure interfaces.

BIM-DRIVEN DELIVERY

Comprehensive BIM development, coordination, clash detection, shop drawings, and technical documentation.

GULF RESIDENTIAL EXPERIENCE

A project type representative of the growing high-rise residential sector across the Gulf region.

PROJECT OVERVIEW

P134 is a high-rise residential development comprising 23 floors above four basement levels serving as parking facilities. The project combines the typical requirements of a modern residential tower with the technical complexity associated with vertical building services, basement infrastructure, and constrained service spaces.

Project Type

High-Rise Residential

Project Coverage

Riyadh · Saudi Arabia

PROJECT SCALE

23 Floors

BASEMENT LEVELS

4 Parking Levels

Main Contractor

TDCO

Consultant

Rafik El-Koury & Partners​

PROJECT ROLE

BIM Design & Coordination

Key Deliverables

Shop Drawings · COBie · LOD 500

BIM SCOPE

Our team is responsible for the full BIM scope across the project, supporting the development of coordinated BIM models and technical deliverables throughout the ongoing project lifecycle. Our scope includes BIM modeling, multidisciplinary coordination, clash detection, shop drawing production, QA/QC, and progressive model development toward LOD 500.

01

MODEL DEVELOPMENT

Detailed BIM model development across the project’s architectural, MEP, and specialist building systems.

02

MULTI-DISCIPLINARY COORDINATION

Continuous multidisciplinary coordination to integrate building systems and resolve technical interfaces.

03

CLASH DETECTION

Identification, review, and resolution of spatial and multidisciplinary coordination issues.

04

SHOP DRAWINGS

Production of coordinated shop drawings and technical documentation based on the developed BIM models.

05

QUANTITY TAKEOFF

Model-based quantity extraction to support project planning, procurement, and commercial requirements.

06

QA/QC

Regular model review and quality verification to maintain BIM standards, model integrity, and deliverable accuracy.

07

COBie & DATA

Development and management of structured BIM information for asset data and information handover.

08

AS-BUILT BIM

Progressive development and documentation of as-built information toward final LOD 500 deliverables.

PROJECT WORKFLOW

PROGRESSING TOWARD LOD 500

Reviewing engineering requirements and available design information.

01

ENGINEERING INPUT

Developing detailed MEP systems within the BIM environment.

02

BIM DEVELOPMENT

Coordinating systems across architectural, structural, and MEP interfaces.

03

COORDINATION

Identifying and resolving spatial and technical coordination issues.

04

CLASH REVIEW

Generating coordinated construction documentation from the developed BIM models.

05

SHOP DRAWINGS

HIGH-RISE COORDINATION

High-rise residential projects introduce a unique coordination environment where building services must be distributed vertically through multiple floors while maintaining consistency, accessibility, and constructability.

01

VERTICAL SERVICES

Coordinating MEP systems across multiple levels and vertical shafts.

02

TYPICAL FLOOR REPETITION

Maintaining consistent model development across repeated residential floor layouts.

03

CORE COORDINATION

Managing dense services around cores, risers, and major vertical interfaces.

04

BASEMENT SERVICES

Coordinating parking levels with associated MEP and building infrastructure.

RESIDENTIAL BIM COMPLEXITY

As high-rise residential developments continue to expand across the Gulf region, projects such as P134 demonstrate the importance of structured BIM workflows in managing vertically distributed services, repeated residential layouts, and technically dense common and service areas.

01

REPETITIVE FLOORS

Efficient BIM workflows for repeated residential layouts and service arrangements.

02

HIGH-DENSITY SERVICES

Integrating multiple building systems within limited ceiling and shaft spaces.

03

VERTICAL DISTRIBUTION

Coordinating risers and vertically distributed services across the tower.

04

PARKING & BASEMENT

Integrating basement services and technical requirements with the tower above.

MEP SYSTEMS

The BIM scope covers a broad range of mechanical, electrical, plumbing, fire protection, and specialist building systems required for the hotel’s operation.

HVAC

Complete HVAC systems and associated services.

FIREFIGHTING

Fire protection systems and associated networks.

PLUMBING

Plumbing and building water systems.

LPG

LPG distribution and associated services.

MV POWER

Medium-voltage power distribution.

LV POWER

Low-voltage power distribution.

STANDBY GENERATORS

Emergency and standby power generation systems.

UPS

Uninterruptible power supply systems.

SMALL POWER

Small power distribution and associated systems.

LIGHTING

Lighting fixtures and associated electrical systems.

LIGHTING CONTROL

Integrated lighting control systems.

CENTRAL BATTERY

Central battery systems supporting emergency lighting requirements.

PROJECT VISUALS

All visuals shown on this page were generated directly from BIM models using Autodesk Revit and Twinmotion.

Technical views are presented directly from the project BIM environment, while selected visuals were enhanced using Twinmotion.

COORDINATED BIM DEVELOPMENT

Continuous development of coordinated project BIM models.

TECHNICAL DOCUMENTATION

Accurate shop drawings and technical deliverables generated from BIM.

IMPROVED COORDINATION

Early identification and resolution of system interfaces and spatial conflicts.

PROJECT-READY INFORMATION

Maintaining structured and coordinated BIM information throughout ongoing delivery.

PROJECT OUTCOMES

CURRENT PROJECT CONTRIBUTION

HAVE A PROJECT IN MIND?

Let’s Build It With Precision.

Tell us about your MEP BIM requirements and let’s discuss how Gridline can support your project.