GRAND HOTEL

HOSPITALITY

GRAND HOTEL QIDDIYA

Qiddiya City · Saudi Arabia

A prestigious luxury hotel located within Qiddiya City, rising across 30 floors above Lower Ground and Ground levels and comprising 246 guest rooms with approximately 57,995 m² of built-up area. Our team is delivering the full BIM scope across the project, supporting detailed MEP development, multidisciplinary coordination, clash detection, shop drawings, QA/QC, and progressive model development throughout the project lifecycle.

Client

Consultant

Main Contractor

Project Type

Project Role

BIM Scope

BIM Development

Project Duration

Qiddiya

BSBG

BUJV

Luxury Hotel Development

Technical Office · BIM Delivery & Engineering Support

Full BIM Delivery · Coordination · Shop Drawings · Quantity Takeoff

LOD 300 → LOD 500

2025- 2027

Client

Multiple International Clients

Project Type

Data Center Design

Services​

Revit Modeling · Coordination · Documentation

Software​

Revit · Navisworks · AutoCAD · ACC

Year​

2024 – 2026

PROJECT HIGHLIGHTS

30-STOREY LUXURY HOTEL

A major hospitality development comprising Lower Ground, Ground, and 30 upper floors.

246 GUEST KEYS

A large-scale hotel development accommodating 246 guest rooms across a highly detailed hospitality environment.

FULL MEP BIM SCOPE

Comprehensive BIM delivery across HVAC, plumbing, firefighting, power distribution, LPG, lighting, UPS, generators, and associated systems.

ONGOING BIM COORDINATION

Continuous model development, coordination, review, and issue resolution throughout the project lifecycle.

PROJECT OVERVIEW

Grand Hotel Qiddiya is a major luxury hospitality development within Qiddiya City, positioned within the East Village North district and overlooking the Formula One-inspired racing environment of Qiddiya. The project comprises Lower Ground, Ground, and 30 floors, with 246 guest rooms and approximately 57,995 m² of built-up area.

Project Type

Luxury Hotel Development

Project Coverage

Qiddiya City · Saudi Arabia

PROJECT SCALE

57,995 m² BUA

BUILDING HEIGHT

30 Floors + Lower Ground + Ground

Main Contractor

BUJV

Consultant

BSBG​

GUEST KEYS

246 Rooms

Key Deliverables

Shop Drawings · COBie · LOD 500

BIM SCOPE

Our team is responsible for the full BIM scope across the project, supporting the development of coordinated BIM models and technical deliverables throughout the ongoing project lifecycle. Our scope includes BIM modeling, multidisciplinary coordination, clash detection, shop drawing production, QA/QC, and progressive model development toward LOD 500.

01

MODEL DEVELOPMENT

Detailed BIM model development across the project’s architectural, MEP, and specialist building systems.

02

MULTI-DISCIPLINARY COORDINATION

Continuous multidisciplinary coordination to integrate building systems and resolve technical interfaces.

03

CLASH DETECTION

Identification, review, and resolution of spatial and multidisciplinary coordination issues.

04

SHOP DRAWINGS

Production of coordinated shop drawings and technical documentation based on the developed BIM models.

05

QUANTITY TAKEOFF

Model-based quantity extraction to support project planning, procurement, and commercial requirements.

06

QA/QC

Regular model review and quality verification to maintain BIM standards, model integrity, and deliverable accuracy.

07

COBie & DATA

Development and management of structured BIM information for asset data and information handover.

08

AS-BUILT BIM

Progressive development and documentation of as-built information toward final LOD 500 deliverables.

PROJECT WORKFLOW

PROGRESSING TOWARD LOD 500

Reviewing engineering requirements and available design information.

01

ENGINEERING INPUT

Developing detailed MEP systems within the BIM environment.

02

BIM DEVELOPMENT

Coordinating systems across architectural, structural, and MEP interfaces.

03

COORDINATION

Identifying and resolving spatial and technical coordination issues.

04

CLASH REVIEW

Generating coordinated construction documentation from the developed BIM models.

05

SHOP DRAWINGS

HOSPITALITY BIM COMPLEXITY

Hotel projects require close coordination between guest-facing spaces, back-of-house facilities, public areas, and technically dense service zones. BIM coordination helps integrate the extensive MEP systems required to support the hotel’s operational and guest experience requirements.

01

GUEST AREAS

Coordinated building services across guest and public spaces.

02

BACK OF HOUSE

Detailed coordination of operational and service areas.

03

TECHNICAL SPACES

Integration of dense MEP systems within specialist rooms and service zones.

04

VERTICAL COORDINATION

Coordination of building services across the project’s 30-floor vertical environment.

MEP SYSTEMS

The BIM scope covers a broad range of mechanical, electrical, plumbing, fire protection, and specialist building systems required for the hotel’s operation.

HVAC

Complete HVAC systems and associated services.

FIREFIGHTING

Fire protection systems and associated networks.

PLUMBING

Plumbing and building water systems.

LPG

LPG distribution and associated services.

MV POWER

Medium-voltage power distribution.

LV POWER

Low-voltage power distribution.

STANDBY GENERATORS

Emergency and standby power generation systems.

UPS

Uninterruptible power supply systems.

SMALL POWER

Small power distribution and associated systems.

LIGHTING

Lighting fixtures and associated electrical systems.

LIGHTING CONTROL

Integrated lighting control systems.

CENTRAL BATTERY

Central battery systems supporting emergency lighting requirements.

DESIGN & MEP COORDINATION

INTEGRATING COMPLEX BUILDING SYSTEMS

The combination of extensive MEP systems within a 30-storey luxury hotel requires continuous coordination between disciplines and building zones. Our BIM workflow supports early identification of conflicts, coordinated system routing, and accurate technical documentation.

PROJECT VISUALS

Explore selected BIM models, design views, and technical deliverables developed across our data center projects.

COORDINATED BIM DEVELOPMENT

Continuous development of coordinated project BIM models.

TECHNICAL DOCUMENTATION

Accurate shop drawings and technical deliverables generated from BIM.

IMPROVED COORDINATION

Early identification and resolution of system interfaces and spatial conflicts.

PROJECT-READY INFORMATION

Maintaining structured and coordinated BIM information throughout ongoing delivery.

PROJECT OUTCOMES

CURRENT PROJECT CONTRIBUTION