ENTERTAINMENT
YANBU ENTERTAINMENT COMPLEX
Yanbu, Saudi Arabia
A large-scale entertainment complex in Yanbu, Saudi Arabia, comprising retail spaces, outdoor plazas, and diverse entertainment facilities. Our team delivered the full BIM scope, from detailed modeling and coordination to shop drawings, COBie, and LOD 500 development, while coordinating across multiple specialists, contractors, and consultant teams.
A major focus of our work was the coordination of complex façade systems, integrated lighting, and a large architectural canopy, where detailed BIM coordination was essential to achieve the required design and technical integration.
Client
Consultant
Main Contractor
Project Type
Project Role
BIM Scope
BIM Development
Project Duration
Seven
Dar Al-Handasah
BUJV
Entertainment Complex
Technical Office · BIM Delivery & Engineering Support
Full BIM Delivery · Coordination · Shop Drawings · Quantity Takeoff
LOD 300 → LOD 500
2023 – 2025
Client
Multiple International Clients
Project Type
Data Center Design
Services
Revit Modeling · Coordination · Documentation
Software
Revit · Navisworks · AutoCAD · ACC
Year
2024 – 2026
PROJECT HIGHLIGHTS
ENTERTAINMENT COMPLEX
A large-scale destination combining retail, outdoor public spaces, and diverse entertainment facilities.
LOD 500 DELIVERY
BIM models progressively developed to detailed LOD 500 deliverables, incorporating final project information.
COMPLEX FAÇADE & LIGHTING
Detailed coordination of façade systems and integrated architectural lighting across challenging external building interfaces.
LARGE-SCALE CANOPY
Coordination of a major architectural canopy with fully integrated lighting and multiple technical interfaces.
PROJECT OVERVIEW
Yanbu Entertainment Complex is a large-scale entertainment development in Yanbu, Saudi Arabia, combining retail destinations, outdoor plazas, and entertainment facilities within a highly detailed architectural environment.
Project Type
Entertainment Complex
Project Coverage
Yanbu · Saudi Arabia
Development
Retail · Entertainment · Outdoor Plazas
BIM Development
LOD 500
Main Contractor
BUJV
Consultant
Dar Al-Handasah
Project Role
BIM Delivery · Coordination · Technical Support
Key Deliverables
Shop Drawings · COBie · LOD 500
BIM SCOPE
Our team was responsible for the full BIM scope across the project, including BIM modeling, multidisciplinary coordination, clash detection, shop drawing production, COBie, and progressive model development to LOD 500.
01
MODEL DEVELOPMENT
Detailed BIM development across the entertainment, retail, and associated building systems.
02
MULTI-DISCIPLINARY COORDINATION
Coordination of building services across different facilities, zones, and interfaces.
03
CLASH DETECTION
Identification, review, and resolution of hard clashes, spatial conflicts, and system interface issues.
04
SHOP DRAWINGS
Production of coordinated shop drawings and technical documentation derived from the developed BIM models.
05
QUANTITY TAKEOFF
Model-based quantity extraction to support project planning, procurement, and commercial requirements.
06
QA/QC
Regular model review and quality verification to maintain BIM standards, model integrity, and deliverable accuracy.
07
COBie & DATA
Development and management of structured BIM information for asset data and information handover.
08
AS-BUILT BIM
Progressive development and documentation of as-built information toward final LOD 500 deliverables.
COBie & AS-BUILT
A key part of the project scope was the development of reliable handover information. BIM models were progressively updated to reflect the final installed condition, while structured COBie data was prepared to support asset information and lifecycle management.
Model information developed and coordinated throughout the project lifecycle.
01
BIM MODEL DEVELOPMENT
Final installed conditions incorporated into the BIM environment.
02
AS-BUILT INFORMATION
Structured asset data organized for project handover and future facility management.
03
COBie HANDOVER
FACADE & LIGHTING
The external façade represented one of the project’s most technically demanding coordination areas. Multiple architectural and technical elements had to be carefully integrated with the façade geometry and lighting systems while maintaining the required design intent.
01
FACADE COORDINATION
Detailed coordination between façade elements and building services.
02
INTEGRATED LIGHTING
Coordination of lighting systems integrated within the external façade.
03
TECHNICAL INTERFACES
Review and resolution of interfaces between architectural and MEP systems.
04
CONSTRUCTABILITY
Using BIM to identify difficult interfaces and develop coordinated solutions before execution.
PROJECT FACILITIES & SUPPORT SPACES
The BIM scope covered a diverse range of facilities and support spaces across the development, each with different operational, technical, and entertainment requirements.
OFFICE BUILDINGS
Administrative and operational workspaces.
KITCHEN FACILITIES
Specialist kitchen areas and supporting services.
CINEMA FACILITIES
Specialized cinema spaces with coordinated architectural, MEP, and technical systems.
BOWLING FACILITIES
Bowling and entertainment areas with integrated building services and technical requirements.
TECHNICAL AREAS
Specialist rooms and building service spaces.
SUPPORT FACILITIES
Additional operational spaces supporting the wider development.
PROJECT CHALLENGES
FAÇADE COMPLEXITY
Highly detailed external façades with integrated technical and lighting systems.
CANOPY COORDINATION
Large architectural canopy with extensive integrated lighting requirements.
MULTIPLE STAKEHOLDERS
Numerous specialists, contractors, and consultant teams working across different packages.
TECHNICAL INTERFACES
Complex interfaces between architectural elements, MEP systems, façade components, and specialist services.
THE CANOPY
A major architectural canopy formed another key coordination challenge, incorporating extensive integrated lighting and multiple technical interfaces. BIM was used to coordinate the canopy geometry, lighting systems, and associated services within a highly constrained architectural environment.
01
COMPLEX GEOMETRY
Coordinating detailed architectural geometry and technical interfaces.
02
INTEGRATED LIGHTING
Coordinating extensive lighting systems within the canopy.
03
MULTI-DISCIPLINARY INTERFACES
Managing interfaces between architecture, MEP, and specialist systems.
04
COORDINATED DELIVERY
Developing coordinated BIM information and drawings for execution.
PROJECT VISUALS
Explore selected BIM models, design views, and technical deliverables developed across our data center projects.
- All
- ENTERTAINMENT COMPLEX
- COORDINATION
- FAÇADE
- SHOP DRAWINGS
- SERVICE ROOMS
LOD 500 HANDOVER
Detailed final BIM information supporting project handover and lifecycle use.
COORDINATED FAÇADE SYSTEMS
Complex façade and lighting interfaces successfully coordinated through BIM.
INTEGRATED CANOPY
Architectural canopy systems and lighting coordinated within the BIM environment.
MULTI-TEAM COORDINATION
Improved coordination across multiple contractors, specialists, and consultant stakeholders.
PROJECT OUTCOMES
Supporting better design decisions through BIM-driven collaboration.